ACCA重要考點:CVP analysis知識點總結+真題講解

2020-11-24 14:50 來源:會計網(wǎng)

  很快又要到2020年12月份ACCA考季了,最近有考生在備考時,有關CVP analysis這部分的真題不知道該如何入手,針對此情況,會計網(wǎng)就跟大家重點講解下關于CVP analysis知識考點。

CVP analysis知識點總結+真題講解

  01、真題練習

  The Alka Hotel is situated in a major city close to many theatres and restaurants.

  The Alka Hotel has 25 double bedrooms and it charges guests $180 per room per night, regardless of single or double occupancy. The hotel’s variable cost is $60 per occupied room per night.

  The Alka Hotel is open for 365 days a year and has a 70% budgeted occupancy rate. Fixed costs are budgeted at $600,000 a year and accrue evenly throughout the year.During the first quarter (Q1) of the year the room occupancy rates are significantly below the levels expected at other times of the year with the Alka Hotel expecting to sell 900 occupied room nights during Q1. Options to improve profitability are being considered, including closing the hotel for the duration of Q1 or adopting one of two possible projects as follows:

  Project 1-Theatre package

  For Q1 only the Alka Hotel management would offer guests a ‘theatre package’. Couples who pay for two consecutive nights at a special rate of $67·50 per room night will also receive a pair of theatre tickets for a payment of $100. The theatre tickets are very good value and are the result of long negotiation between the Alka Hotel management and the local theatre. The theatre tickets cost the Alka Hotel $95 a pair. The Alka Hotel’s fixed costs specific to this project (marketing and administration) are budgeted at $20,000.The hotel’s management believes that the ‘theatre package’ will have no effect on their usual Q1 customers, who are all business travellers and who have no interest in theatre tickets, but will still require their usual rooms.

  Project 2-Restaurant

  There is scope to extend the Alka Hotel and create enough space to operate a restaurant for the benefit of its guests.The annual costs, revenues and volumes for the combined restaurant and hotel are illustrated in the following graph:

CVP analysis知識點總結+真題講解

  Note: The graph does not include the effect of the ‘theatre package’ offer.

  Required:

  (a) Using the current annual budgeted figures, and ignoring the two proposed projects, calculate the breakeven number of occupied room nights and the margin of safety as a percentage. (4 marks)

  (b) Ignoring the two proposed projects, calculate the budgeted profit or loss for Q1 and explain whether the hotel should close for the duration of Q1. (4 marks)

  (c) Calculate the breakeven point in sales value of Project 1 and explain whether the hotel should adopt the project. (4 marks)

  (d) Using the graph, quantify and comment upon the financial effect of Project 2 on the Alka Hotel. Note: There are up to four marks available for calculations. (8 marks)

  02、分析過程

  第一步:首先看分數(shù),按分估小點,宜多不宜減;

  4分的題目通常就需要回答到兩個點,如果題中考的是簡單定義的默寫有可能會一分一個點;8分的題目通常是4個點每個點2分。

  第二步:問題要先讀,圈出關鍵詞,分析知識點;

  (a) 計算BEP和margin of safety as a percentage,結合上一步的分析,確定按照一個計算兩分寫;(需要注意的是,考生做題的時候過程盡量寫詳細,結果算錯了但是過程正確是有分的)

  (b) 忽略這兩個項目,計算第一季度的預算利潤或虧損,并解釋酒店是否應該在第一季度關閉?;究梢钥闯鍪莄alculate和explain一個兩分。

  (c) 計算項目1的BER,說明酒店是否應該采用該項目?;究梢钥闯鍪莄alculate和explain一個兩分。

  (d) 利用圖表,量化并評論項目2對Alka酒店的財務影響。下面批注了計算可以占4分,剩下四分是文字。

  以上是對問題的分析,可以看出前面兩個問題都是和project 1&2沒有關系的,所以先帶著前兩個問題看Project 1-Theatre package之前的背景。然后再分別看第三個和第四個問題。

  第三步:開始讀題目,帶著問題讀,高亮標題干;

  (a)\(b)問先讀Project 1-Theatre package之前:

  ? 25 double bedrooms,$180 per room per night:25間雙人房,無論是單人房還是雙人房,每個房間每晚收費180美元

  ? variable cost is $60 per occupied room per night:每間客房每晚60美元

  ? 365 days a year, 70% budgeted occupancy rate

  ? Fixed costs $600,000 a year ? First quarter (Q1) sell 900 occupied room nights

  (a) 問的是計算,先把公式寫上,然后帶入數(shù)據(jù)。帶數(shù)據(jù)過程中發(fā)現(xiàn)由某一個數(shù)據(jù)是題中沒有告訴的,建議寫Working,因為機考時EXCEL表格不能插入行。

  BEP= Fixed cost/contribution per room per night= $600,000 /$120(W1)=5000 occupied room nightsMargin of safety as a percentage= (Budgeted room occupancy – breakeven room occupancy)/budgeted room occupancy=(6387.5(w2)-5000)/6387.5(w2)=21.72%

  Working 1:

  Contribution per room=sales price per room per night-variable cost=$180-$60=$120 per room per night

  Working 2:

  Budgeted room occupancy=25 double bedrooms*365 days a year*70% budgeted occupancy rate=6387.5 occupied room nights

  (b)問的是計算結合文字,習慣寫法是先把計算寫出來,然后再分析。

  Profit or loss for Q1:

  Total Contribution=Contribution per room*occupied room nights=$120*900=$108000

  Profit/loss=total contribution-FC=$108000-$600,000*(3/12)= $-42000(一定要注意這里的FC只算一個季度的,也就是3個月)

  Explain whether the hotel should close for the duration of Q1:

  如果關閉,損失銷售收入節(jié)約變動成本,也就是損失contribution:108000

  但是固定成本$600,000*(3/12)=150000不會被節(jié)約,普通的固定成本只有關閉企業(yè)完全不生產(chǎn)之后才可以被節(jié)約。

  所以最后觀點是should not close,書寫過程為:The Alka Hotel should not close in Q1.(先把觀點擺出來)The fixed costs will still be incurred and closure would result in lost contribution of $108,000. This in turn would result in a decrease in annual profits of $108,000. (根據(jù)背景解釋原因)In addition, the hotel could lose customers at other times of the year, particularly their regular business customers, who may perceive the hotel as being unreliable.(開腦洞,根據(jù)實際情況去分析有可能出現(xiàn)的情況,這一點不一定和答案相同,言之有理即可)

  第三步:開始讀題目,帶著問題讀,高亮標題干;

  ? two consecutive nights at a special rate of $67.50 per room night will also receive a pair of theatre tickets for a payment of $100.:連續(xù)兩晚以67.50美元/間的特殊價格入住的夫婦還將獲得兩張劇院門票。也就是sales price=$67.50*2+$100=$235

  .? theatre tickets cost $95 a pair

  ? fixed costs specific to this project $20,000.

  (c)問的是計算結合文字,習慣寫法是先把計算寫出來,然后再分析。需要注意的是本小問的項目是一個單獨的項目,對原來的客戶沒有影響(have no effect on their usual Q1 customers),所以評估的時候也是單獨評估。

  BER of project 1=Fixed cost / C/S ratio=$20,000/8.51%(w3)=$ 235017.63

  Working 3:注意收入和變動成本都是由兩個部分組成。Sales price=$67.50*2+$100=$235VC=$60*2+$95=$215Contribution=$235-$215=$20C/S ratio=$40/$235.=8.51%

  Explain whether the hotel should adopt the project:

  從上面的計算可以看出,單位貢獻是$20比較低,如果要讓contribution覆蓋掉固定成本$20,000,需要1000個兩晚+影院票賣出去,也就是2000 occupied room nights。Q1可獲得的房間數(shù)是25*365*(3/12)=2281.25 room nights,其中正常的客戶需要900晚,所以是不夠的,should not adopt project 1.

  Project 1 is not viable at the quoted prices.(通常習慣把結論放前面,讓考官明確你的觀點)

  The unit contribution per theatre package is low and it requires a large number of sales to break even. Each theatre package would require two room nights to be sold which would mean 2,000 room nights needed in Q1 to break even. (需要的)

  The available rooms for Q1 are only 2,281·25 (9,125/4) and the Alka Hotel has already sold 900 rooms, so there is insufficient capacity. (可獲得的)

  第三步:開始讀題目,帶著問題讀,高亮標題干;(這個題的題干很少,主要是圖像,所以先在草稿紙上分析圖像)

CVP analysis知識點總結+真題講解

  (d)問是文字+計算,但是不按照先寫計算再寫文字,因為計算一開始沒辦法明確算的是什么,最好是根據(jù)文字的邏輯去計算。

  ? 銷售收入:找到sales直線上唯一一個標了橫縱坐標的點(8000,2000000),所以sales price=2000000/80000=$250,以前是$180 per room per night,可以看出餐廳業(yè)務平均每間房每晚增加了70的收入。? 變動成本:total cost和fixed cost之間的差異就是VC,所以8000 rooms對應的VC是1560000-800000=760000,VC per room=760000/8000=$ 95 per room。相比于以前的$ 60 per room增加了$ 35 per room,這反映了餐廳業(yè)務的可變成本。? 固定成本:從600000變到了800000,因為餐廳業(yè)務增加了200000的成本;? 由于這些變化,收支平衡點從5000間客房增加到5161間客房(圖中直接看出),因此酒店需要銷售更多的客房夜來彌補成本。? 當前的預計銷售房間數(shù)是7300(圖像中),占總數(shù)的80%(7300/9125),安全邊際是(7300-5161)/7300=29.30%,這是大于當前的安全邊際的(29.30%>21.72%),風險更小了。? 利潤:sales-total cost=7300*$250-7300*$ 95 per room-800000=$331,500

  今天的內容就到這里啦~關注會計網(wǎng),很多ACCA干貨分享~

  來源:ACCA學習幫

學習資料/免費課程/新人優(yōu)惠券>>
文章版權會計網(wǎng)kuaiji.com所有,未經(jīng)許可不得轉載。
最新文章
  ACCA指的是特許公認會計師公會,在國際上得到廣泛認可,考取ACCA能夠為個人的職業(yè)發(fā)展提供有力的支持和保障,吸引了很多人報考,青島acca培訓班怎么選?哪家比較好?一起來看看吧。
2024-12-22
2025年ACCA持證者的就業(yè)方向!ACCA(特許公認會計師公會)作為全球最具影響力的會計師組織之一,其會員資格在國際上享有極高的認可度。持有ACCA證書的財務人才在全球范圍內擁有廣泛的就業(yè)機會,他們可以在多個領域和行業(yè)中發(fā)揮專業(yè)優(yōu)勢,實現(xiàn)職業(yè)發(fā)展與個人價值的提升。
2024-12-22
ACCA考試還可以免考?當然!ACCA考試科目多是眾所周知的如果有免考的科目,那豈不是可以省下很多時間去備考別的科目了?最近就有小伙伴問學姐,ACCA免考五門需要什么條件?免考耽誤拿證嗎?那么學姐今天就給大家進行一個解答,希望可以幫助到大家。
2024-12-22
最新更新
編輯推薦
全站精華
學習備考資料
133 1191 2314
立即咨詢
今 日 網(wǎng) 站 訪 問 用 戶 數(shù)
資料中心
今日領取時間僅剩
2 3
:
5 3
:
1 0
領取CFA試聽課程
自動輸入歷史信息
立即預約
最新參與客戶
題庫火熱使用中
1180人在線刷題中
精選問答
2024年ACCA考試地點有哪些?
展開
2024年ACCA考試地點分為隨時機考考點和分季機考考點,其中隨時機考考點包括:北京、天津、長沙、成都、重慶、廣州、南京、上海、深圳、蘇州、杭州等。分季機考考點包括:北京、天津、長沙、成都等
2024年acca時間安排及報名費用如何?
展開
2024年3月ACCA考試時間安排,3月4日周一-3月8日周五;6月ACCA考試時間,6月3日-6月7日。
ACCA考試學習資料包怎么找?
展開
會計網(wǎng)提供提高學習能力和效率的系列資料包括ACCA學習資料,ACCA備考資料,它是同學們在學習ACCA備考中必備資料,考試成功秘籍,更多備考問題歡迎同學留言或聯(lián)系我們老師免費咨詢。
獲得了1v1專業(yè)解答
立即咨詢
會計網(wǎng)App
大?。?47.93MB
立即下載
已獲得11324345名會計學員認可